Skip to main content

Elite Electric

Call
Skip to content
Offices · retail · apartments · fleets

Commercial EV Chargers Draper UT: charging your lot is ready for

Level 2 and DC fast chargers planned around your electrical service, your parking layout and Rocky Mountain Power's business rebates. Our own licensed electricians handle the load study, trenching, permit and install.

  • Level 2and DC fast
  • RMPrebate paperwork help
  • Loadstudy before you buy
  • 10-yrworkmanship warranty
OFFICE · RETAIL · FLEET
The short answer

How Commercial EV Chargers Draper UT Businesses Install Work

A commercial charging project starts with your electrical service, not the charger. We check how much spare capacity you have, pick Level 2 or DC fast to match how long drivers park, plan the shortest route from power to parking, and apply for Rocky Mountain Power's business rebates before equipment is bought.

Done in that order, you avoid the two expensive surprises: a service upgrade nobody planned for and a rebate you no longer qualify for.

Elite Electric · 8389 S 700 W, Sandy · Reviewed by Jason Grimes, DOPL Licensed Master Electrician · Updated

Level 27 to 19 kW per port. For cars parked an hour or more: offices, apartments, hotels.
DC fast50 kW and up. For quick stops, retail along busy roads and fleet turnarounds.
Request a proposal

Tell Us About Your Property

The address, how many ports you're thinking about and a photo of your main electrical room or panel are enough to start. Rebecca calls back within one business day to set up a site walk.

  • Load study before you buy hardware
  • Help with Rocky Mountain Power rebate paperwork
  • Written proposal with every line itemized

Commercial EV charger request

A photo of the panel or electrical room helps most.

Site planner

How Much Power Do Our Chargers Need?

Pick your property, ports and charger type. You'll see the total load, what it likely means for your electrical service and a national installed cost range.

Charging site planner

Property type
How many charging ports?
Charger type
Power share between ports?

—

0kW load
0amps at 208V 3-phase
—installed range

—

    A planning guide, not a quote. National ranges from Qmerit. The real numbers come from a load study of your building.

    Each lit bay is one port in your plan.

    The amps number is the one that matters most. A building's service is sized in amps, and every port draws from the same supply as your lights, HVAC and equipment. When the total gets close to your spare capacity, load management lets chargers share power, so four cars can charge on a circuit sized for two at full speed. For long dwell times like a workday, drivers rarely notice the difference.

    That raises the next question: how fast does each type actually charge?

    Charging speed

    Level 2 vs DC Fast: Miles Added per Hour

    Rough figures for a typical EV using about 3.5 miles per kWh. Real speeds depend on the car.

    • Level 2 · 7 kW~25 mi/hr

      A workday adds 150+ miles. Ideal for employees and residents.

    • Level 2 · 19 kW~65 mi/hr

      Only if the car can accept it. Useful for fleets and short visits.

    • DC fast · 150 kW~500 mi/hr

      Peak rate; cars slow down as the battery fills. Built for quick stops.

    Most businesses don't need the fastest option. Matching speed to how long people stay keeps costs down: a Level 2 port is a fraction of the price of a DC fast charger, and an employee parked for eight hours gets plenty of range from it. Where your drivers park, and for how long, depends on the kind of property you run.

    Property types

    Commercial EV Chargers Draper UT Properties Install

    Four common setups, each with a different best answer.

    Offices and workplaces

    Level 2 for employees parked all day. A perk that helps hiring at tech offices along the I-15 corridor.

    Retail and restaurants

    Level 2 for longer visits, DC fast near busy roads. Chargers bring in customers who stay a while.

    Apartments and HOAs

    Shared Level 2 with access control and billing, so residents pay for what they use.

    Fleet depots

    Overnight Level 2 for most vans, DC fast for vehicles that run double shifts.

    Whatever the property, Draper sits in Rocky Mountain Power territory, which opens up business charger rebates. Getting those rebates right is part of the plan from day one.

    One more thing shapes every property type: who pays for the electricity. Offices often give charging away as a perk, retail sites may charge a small fee or offer it free to customers, apartments usually bill residents for what they use, and fleets just want the lowest cost per mile. Each answer changes which chargers and software make sense, so it's one of the first questions we ask on a site walk. It also affects rebates, because some programs set different rules for public, workplace and multifamily charging.

    Rebates and taxes

    Rebates and Taxes for Business Chargers in 2026

    What's available, what's gone and what to plan for.

    RMP Level 2 rebate

    Workplaces, communities and multifamily. New, UL-certified chargers bought on or after Jan 1, 2026.

    Up to $1,500

    RMP DC fast rebate

    Depends on port count and power level. Capped at a share of charger cost.

    Up to $42,000

    Utah DEQ Clean Fleet grants

    For fleets replacing vehicles; can include charging equipment and installation.

    Up to 45%

    Federal 30C charger credit

    Expired June 30, 2026.

    $0

    Utah tax on charging sales

    If you charge drivers, electricity sold for EV charging is taxed.

    12.5%

    Sources: Rocky Mountain Power, ChargePoint incentive summary, U.S. DOE AFDC Utah laws. Amounts change; we confirm the current figures before you buy.

    Timing matters. Rebate programs usually require pre-approval or specific equipment, so the application belongs before the purchase order, not after the install. We help with the electrical sections of the paperwork and make sure the chargers you pick are on the eligible list. Once the money side is clear, the next decision is how smart your chargers need to be.

    Smart or simple

    Networked or Simple Chargers?

    The software choice shapes how you run the chargers for years.

    Simple, non-networked chargers

    Lower cost, nothing to subscribe to. A good fit for a small office or fleet where only your own staff or vehicles plug in and you don't need to bill anyone. You won't see usage data, and you can't limit access beyond a locked lot.

    Networked chargers

    Connect to an app or dashboard. You can set prices, limit charging to employees or residents, see usage, get alerts when a port goes down and share power between ports. Nationally, network software runs about $275 to $480 per port each year, and many rebate programs prefer or require it.

    Most Draper businesses that charge the public, or that serve apartments and HOAs, end up networked because billing and access control are the whole point. A small company charging its own vans often doesn't need it. We'll explain the trade-off for your site and wire for either, so you can switch later without rewiring. Whichever way you go, a few planning mistakes are worth avoiding.

    Lessons learned

    Five Charging Project Mistakes to Avoid

    1. Buying chargers before the load study

      The hardware may be fine, but if your service can't carry it, you're stuck paying for an upgrade you didn't budget for.

    2. Applying for rebates too late

      Programs can require approval or eligible equipment before purchase. Late applications can lose the money.

    3. Putting chargers far from power

      Every extra foot of trench across asphalt adds cost. The bays closest to the electrical room are usually the cheapest.

    4. Skipping spare conduit

      Demand grows. Empty conduit installed now makes the next four ports a fraction of the cost.

    5. Oversizing the speed

      A DC fast charger at an office where cars sit all day costs far more and adds little for drivers.

    Each of these comes down to planning in the right order, which is exactly what the six-step process below is built around.

    Site work

    From Site Walk to First Charge

    Six steps for every commercial charging project.

    1. Site walk and goals

      Parking layout, who charges and for how long, and where power lives in the building.

    2. Load study

      We measure what your service can spare and decide between existing capacity, load management or new service.

    3. Design, rebates and permit

      Charger selection, layout with accessibility in mind, rebate paperwork and the city electrical permit.

    4. Trenching and conduit

      The shortest safe route through asphalt or landscaping, with spare conduit for future ports.

    5. Install and connect

      Panels, breakers, pedestals or wall units, network setup and labeling.

    6. Inspection and handoff

      City inspection, commissioning, and a walkthrough of the app or network dashboard.

    The best money-saving step happens at step four. Running extra empty conduit while the trench is open costs very little, and it means you can add ports later without cutting the parking lot again. With the process laid out, here's how the costs break down.

    Cost

    Commercial EV Chargers Draper UT Cost

    National figures for planning. Your site walk turns these into a written number.

    ItemNational range
    Level 2, per port installed$3,500–$15,000
    DC fast, per port installed$18,000–$350,000+
    Trenching, per linear foot$75–$150
    Accessible charging space$3,000–$7,000
    Network software, per port per year$275–$480
    Permitting and project management3–5% each
    Elite ElectricWritten proposal after a site walk

    National ranges from Qmerit's commercial charging cost guide.

    The hardware is often not the biggest line. Distance from the electrical room to the parking spaces, whether the trench crosses asphalt, and whether your service needs an upgrade usually move the total more than the charger brand. We don't post a commercial price online because two buildings with the same number of ports can differ by thousands of dollars. For homes, see our residential EV charger cost guide or Tesla charger installation.

    The people doing that site walk are the same ones who install it.

    Your crew

    The Electricians Behind Your Charging Project

    Licensed, local and on our own payroll.

    Jason Grimes, Elite Electric Master Electrician, in a cap and sunglasses in front of solar panels
    Jason GrimesDOPL Licensed Master Electrician #7810706-5502

    Master Electrician. Runs the load study and signs off on every circuit, panel and charger.

    Christian, Elite Electric project manager, in a grey hoodie and company cap
    ChristianProject Manager

    Project Manager. Coordinates rebates, permits, trenching and the install schedule around your business.

    Tyler Gordon, owner and operator of Elite Electric, outdoors in a dark T-shirt
    Tyler GordonOwner & Operator

    Owner and Operator. Backs every commercial job with our 10-year workmanship warranty.

    Because they install residential chargers, panels, solar and batteries every week, they know how to fit charging into a building that already has a lot going on, without shutting your business down for the day. Most commercial work is scheduled around your hours, and we keep the lot open wherever we can.

    Here's what customers say about working with them.

    Reviews

    Why Draper Businesses Call Elite Electric

    ★5.0 from 54 Google reviews
    #Master Electrician license #7810706-5502 (Utah DOPL)
    ⌂Local shop at 8389 S 700 W, Sandy
    “Couldn't have found a better electrician to do the job!”
    Matt HempleGoogle review
    “He was polite, professional and fair priced. Not the cheapest but not even close to some other quotes I got.”
    Zack BetzsoldGoogle review
    “Everything you would hope for from an electrician.”
    Joe LevyGoogle review
    “Justin Foss helped out on a electrical project for us. Did an amazing job. Highly recommended.”
    Ryan LarsenGoogle review

    Brands we partner with

    Elite Electric is a partner installer for these manufacturers, so the equipment we install is backed by both the maker's warranty and our 10-year workmanship warranty.

    • Tesla logo
    • Enphase logo
    • SolarEdge logo
    • Sol-Ark logo
    • PointGuard by Sigenergy logo
    • HomeGrid logo
    • Franklin Electric logo
    • Generac logo
    • SPAN logo
    • APsystems logo
    • EcoFlow logo
    • Anker logo

    Our shop is ten minutes from Draper, and we work across the Wasatch Front.

    Service area

    Commercial Charging Across the Wasatch Front

    Draper, Sandy, South Jordan, Lehi and beyond. See also our commercial electrician services.

    Real Elite Electric charger and service work. Tap a photo to enlarge it. The proposal form is just below.

    Proposal

    Plan Your Charging Site

    Share what you know and we'll fill in the rest at the site walk.

    • Property address and type
    • Number of ports you're considering
    • Your result from the planner above
    • A photo of the main panel or electrical room
    Two EV chargers mounted side by side by Elite Electric
    Two chargers on one wall, installed by our crew.

    Commercial EV charger request

    Photo uploads welcome.

    Questions

    Commercial EV Chargers Draper UT FAQ

    How much do commercial EV chargers cost to install?

    Nationally, Level 2 runs about $3,500 to $15,000 per port installed and DC fast chargers about $18,000 to more than $350,000 per port. Your site's distance from power and electrical capacity decide where you land.

    Does Rocky Mountain Power offer rebates for business chargers?

    Yes. RMP lists Level 2 and DC fast charger rebates for workplaces, communities and multifamily properties, with published figures of up to $1,500 per Level 2 charger and up to $42,000 for DC fast. Confirm current amounts with RMP before you buy.

    Is there still a federal tax credit for EV chargers?

    No. The federal 30C charger credit expired June 30, 2026.

    Level 2 or DC fast: which should my business install?

    Level 2 suits places where cars park for hours: offices, apartments and hotels. DC fast suits short stops along busy roads and fleets that need quick turnarounds.

    How many chargers should we start with?

    Most sites start with two to four Level 2 ports and run conduit for more. Adding ports later is much cheaper when the trenching is already done.

    Do we need a new electrical service?

    Not always. A load calculation tells us what your existing service can carry. Load management can share power between ports to avoid an upgrade.

    Can we charge drivers to use the chargers?

    Yes, with networked chargers. Utah applies a 12.5% tax to electricity sold for EV charging, so plan for that in your pricing.

    Do EV parking spaces need to be ADA accessible?

    Accessibility rules can apply to charging spaces. We plan layouts with that in mind; nationally an accessible space adds about $3,000 to $7,000.

    How long does a commercial install take?

    Small Level 2 projects can take days once permitted. Larger or DC fast projects take longer because of utility coordination and equipment lead times.

    When can I reach you?

    Call +1 (801) 928-7219 Monday to Saturday, 9 to 5, or send the form any time.

    Ready to plug in

    Give drivers a reason to park here.

    Book a site walk. We'll check your power, plan the bays and help line up the rebates before you buy a single charger.

    +1 (801) 928-7219