Solar Panel Installation Lehi: your city still credits solar one-for-one
Most of Utah moved to low export credits. Lehi City Power's net metering agreement still credits extra solar as kilowatt-hours on your next bill. We design for Lehi's rules, file through the city's solar portal, and install with our own licensed crew.
What a month of extra solar is worth
Lehi values credits at your own retail rate under its net metering agreement; unused kWh credits are surrendered at the March billing. RMP figure uses its 2026 summer Schedule 137 credit. Illustrative — enter your actual rate.
Solar panel installation Lehi homeowners get in 2026 averages $2.27 per watt — about $27,353 for a typical 12.03 kW system, per EnergySage — and most Lehi homes are served by Lehi City Power, whose net metering agreement credits extra solar as kilowatt-hours on your next bill. Lehi is one of the communities we cover as solar panel installers in Utah County.
That's a very different deal from Rocky Mountain Power's 4–5¢ export credit. Lehi applications go through the city's solar portal, the city installs a separate production meter, and systems can't operate until Lehi City Power gives written approval. Our licensed crew handles the design, the portal filing, the permit and the install, with a written, flat-rate price within 24 hours. Our Saratoga Springs solar installers page covers that city's details. You can meet our licensed Sandy, UT electricians before anyone comes to your home.
Utah County installSend a Lehi City Power Bill, Get a Design
Your usage tells us the right size, and your bill confirms which utility serves you — the single biggest factor in how solar pays off in Lehi. Add your address and we'll send a design and a written, flat-rate price, including the city portal filing.
- Designed for Lehi City Power's rules
- Portal filing, permit and meter coordination included
- Licensed electricians, no subcontractors
Lehi solar price request
How Lehi City Power Handles Solar
Lehi runs its own electric utility, so its solar rules come from the city's net metering agreement and standards — not from Rocky Mountain Power's tariffs. Here's what they say.
Extra solar becomes kWh credit
When you produce more than you use in a billing period, the net excess is credited as kilowatt-hours on the following bill.
Unused credit ends in March
Kilowatt-hour credits accumulated over the year are surrendered at the March billing period without payment, so oversizing doesn't pay.
A second meter for production
Lehi installs a production meter; the homeowner provides its meter base within 5 feet of the main service disconnect.
Written approval before power-on
The system can't run in parallel with the grid until Lehi City Power inspects and approves it in writing.
Ask before modifying
Adding panels, batteries or changing wiring later needs the city's written approval first. Batteries may require additional review.
The city keeps renewable credits
Under the agreement, Lehi City Power owns the renewable energy certificates tied to your system's output.
Sources: Lehi City Power Net Metering License Agreement and Net Metering Standards and Application 4.0, published on lehi-ut.gov. Rules can change — we confirm the current versions for every project.
Lehi City Power vs Rocky Mountain Power for Solar
Neighbors a few miles apart can get very different value from the same panels. Check the logo on your bill first.
| Lehi City Power | Rocky Mountain Power | |
|---|---|---|
| Extra solar credited as | kWh on your next bill | 4.855¢ / 4.033¢ per kWh (Schedule 137) |
| Unused credit | Surrendered at March billing | Expires at the March meter read |
| Application | Lehi solar portal + city agreement | Rocky Mountain Power interconnection |
| Wattsmart battery rebate | Not available | Up to $2,000 for qualifying batteries |
| Battery's main job | Outage backup | Backup plus storing low-credit exports |
If your bill says Rocky Mountain Power instead, the statewide rules apply; see net metering in Utah. Other Utah cities with their own utilities, such as Murray and Provo, set their own rules too.
What Solar Panel Installation in Lehi Costs
Slide to a system size for a typical Lehi price at EnergySage's local average. Your written quote replaces the estimate.
Estimated at $2.27 per watt before any incentives.
Sources: EnergySage local solar cost data — Lehi (July 2026; average system $27,353, range $23,250–$31,456), Salt Lake City and Utah (October 2026). See every city on solar panel cost Utah 2026.
The 30% federal credit for homeowner-owned systems ended December 31, 2025, so a 2026 quote shouldn't subtract it for a cash or loan purchase. Leases and power purchase agreements are different — compare their total cost, not just the monthly payment. If you're still deciding, see how to switch to solar and what to look for in a solar contract.
Sizing Solar Panel Installation Lehi Homes Get Right
Because Lehi credits extra solar as kilowatt-hours, summer surplus can carry your bills into fall and winter. That makes it reasonable to size a Lehi system to cover most or all of a year's usage — a goal that rarely makes sense on Rocky Mountain Power's low export credit.
The limit is the March reset. Credits left over at the March billing period are surrendered without payment, so a system that produces far more than you use builds a credit balance that simply disappears. We size from 12 months of your Lehi City Power usage, then show the expected month-by-month balance so you can see where credits build and where they're used.
Growing family, new EV or heat pump on the way? Tell us. A planned load is a good reason to size up now, because adding panels later requires the city's written approval and another round of paperwork. If your electrical panel needs room for that growth, see electrical panel upgrades.



From Application to Power-On in Lehi
Lehi requires its solar paperwork through the city's online portal. Here's the order of work — we handle every step.
Design
Sized from your Lehi City Power usage.
Portal filing
Net metering agreement, standards and application, building form and checklist.
Over 10 kW?
A power purchase agreement is also required.
Permit and install
Electrical permit, then our crew installs, including the production meter base.
Inspection
Electrical inspection, and Lehi may attend initial testing.
Written approval
Lehi City Power approves; the system goes live.
Lehi asks applicants to submit the most current versions of its agreement and application forms, and to send updates to an existing application by email. We track those versions so your application isn't sent back. Every design is reviewed by Jason Grimes, our DOPL licensed Master Electrician.
Lehi's Solar Power Purchase Program, Explained
Lehi also runs a Solar Power Purchase Program, sometimes called a feed-in arrangement. Instead of offsetting your own bill, your system's output goes to the city grid under a 20-year fixed-price agreement: 5¢ per kWh for systems from 1 to 10 kW, and 4¢ per kWh above 10 kW. The program has a $1,500 application fee, the city keeps the renewable credits, and the city may adjust the price with council approval.
For most homeowners who use their own power, standard net metering is the better fit, because a kWh credited against your bill is worth your full retail rate. The purchase program can make sense for larger systems or owners who want a separate, predictable payment. We'll lay out both if your project could qualify.
Do Batteries Make Sense With Lehi Solar?
Honestly, the case is different in Lehi. On Rocky Mountain Power, a battery earns its keep partly by storing solar that would otherwise export for about 4–5¢. Lehi's kWh-for-kWh credit already gives exported solar its full value, so a battery's main benefit here is outage backup — keeping the fridge, furnace fan, internet and lights running when the grid goes down.
That's still worth a lot to many families. Rocky Mountain Power's Wattsmart Battery rebate doesn't apply to Lehi City Power customers, and Lehi's standards note that systems with batteries may need additional review. We include that review in the plan. Compare options on home energy storage Utah or see Tesla Powerwall installation — we install Powerwall 3 as a Tesla Certified Installer.



What to Ask About Solar Panel Installation Lehi Quotes
Lehi's rules are different enough that an installer who mostly works on Rocky Mountain Power homes can get them wrong. Ask these before you sign.
Do you know Lehi's process?
Ask how they handle the city's solar portal, the production meter base and the written approval step. Vague answers mean delays later.
Was it sized for Lehi credits?
A design built for Rocky Mountain Power's export credit may be undersized for Lehi — or oversized past what the March reset allows.
Who installs and services it?
Ask whether the crew works for the company, and who reviews the electrical design. Ours is reviewed by a DOPL licensed Master Electrician.
Running a business in Lehi? Commercial solar projects need Lehi's power purchase agreement as well as the net metering paperwork; see commercial solar installation Utah. Already have panels that aren't producing like they should? We service systems we didn't install — see solar maintenance and repair — and because Lehi requires written approval for changes, adding a battery to existing solar is planned with the city from the start; see adding a battery to existing solar.
Whatever you choose, get every quote in writing with the system size, equipment, Lehi paperwork and production meter base listed on separate lines. That's how solar panel installation Lehi quotes become comparable. Current statewide programs are summarized on Utah solar incentives.
Solar Our Crew Has Installed Along the Wasatch Front
More installs and brands are on solar panel installation Utah and Enphase solar installation.
“In Lehi, a kilowatt-hour you send out comes back as a kilowatt-hour. We design around that.”— How we plan solar for Lehi City Power homes
Get Your Solar Panel Installation Lehi Price
Send a recent Lehi City Power bill, or 12 months of usage, and your address. Rebecca follows up within one business day, and Christian and Jason Grimes send a written, flat-rate design and price within 24 hours — portal filing, permit and production meter base included.
Lehi solar request
What Our Solar Customers Say
“Ever since i got my Solar system installed, my power bills are down to just the metering fee.”
“It was simple, easy and affordable. He helped setup a network connection to monitor solar intake on my phone and was out and done in a few hours. Did a great job on caulking/securing the hole that he drilled through my exterior to run some lines and I highly recommend him.”
“Couldn't ask for better. No hassle no pain. Easy to work with.”
“Great company”
Solar Panel Installation Lehi FAQ
Does Lehi still have net metering for solar?
Lehi City Power's current net metering agreement credits net excess solar as kilowatt-hours on the following bill, rather than the per-kWh export credit Rocky Mountain Power pays. Kilowatt-hour credits accumulated over the year are surrendered at the March billing period. We confirm the current agreement version for every project.
How much does solar panel installation cost in Lehi?
EnergySage's July 2026 data puts the Lehi average at $2.27 per watt, or about $27,353 for a typical 12.03 kW system, with most quotes between $23,250 and $31,456. A 5 kW system averages about $11,365. Our written price is flat and includes the city portal filing and permit.
How do I apply for solar in Lehi?
Lehi requires solar applications through its online solar portal, with the net metering agreement, the net metering standards and application, a building department form and the solar permit checklist. Commercial systems and residential systems over 10 kW also need a power purchase agreement. We prepare and submit everything.
Does Lehi City Power install a separate meter for solar?
Yes. Lehi installs a production meter to record your system's output, and the homeowner provides the meter base within 5 feet of the main service disconnect. We include that meter base in the installation.
Can I get the Wattsmart battery rebate in Lehi?
No. Wattsmart is a Rocky Mountain Power program, so Lehi City Power customers aren't eligible. Batteries in Lehi are mainly about outage backup, and Lehi's standards note that systems with batteries may need additional review.
What is Lehi's Solar Power Purchase Program?
It's a 20-year fixed-price agreement where your system's output goes to the city grid: 5 cents per kWh for 1 to 10 kW systems and 4 cents per kWh above 10 kW, with a $1,500 application fee. Most homeowners do better with net metering, which credits kilowatt-hours against their own bill.
How big should my solar system be in Lehi?
Because Lehi credits excess solar as kilowatt-hours, sizing to cover most or all of a year's usage often makes sense. Credits left at the March billing period are surrendered, though, so we size from 12 months of your usage and avoid building a surplus you can't use.
Do I need Lehi's approval before my solar turns on?
Yes. The system can't operate in parallel with the grid until it passes electrical inspection and Lehi City Power gives written approval. Later changes, such as adding panels or a battery, also need the city's written approval.
Is there still a federal tax credit for solar in Lehi?
Not for systems you own. The 30% federal residential credit ended December 31, 2025. Leases and power purchase agreements may still pass along a business credit, so compare total cost rather than only the monthly payment.
How do I get a solar price for my Lehi home?
Call +1 (801) 928-7219 or use the form on this page with a recent Lehi City Power bill and your address. Rebecca follows up within one business day, and your written, flat-rate design and price arrive within 24 hours.
Make Lehi's one-for-one credit work for you
Send a Lehi City Power bill and your address. Rebecca replies within one business day, and your written design and flat-rate price follow within 24 hours.
+1 (801) 928-7219